M2100E Install Video

M2100E Installation Full Install
Welcome to the Smoke Guard video install series. In this tutorial, we’ll walk you through the complete installation of the M 2100 E system.

M2100E Installation – Full Install

M2100E Installation – Step 1: Unboxing

Welcome to the Smoke Guard Video install series. In this tutorial, we’ll walk you through the introduction and unboxing step of the M 2100 E installation

M2100E Installation – Unboxing

M2100E Installation – Step 2: Tools

This video covers the tools needed for the M2100E installation, part of Smoke Guard’s 10-step install series. Watch as a quick guide or continue with the full walkthrough.

M2100E Installation – Tools

M2100E Installation – Step 3: Housing
This video covers the Housing Step of the M2100E installation. Learn how to mount the housing, route the I/O harness, and install the DIN rail for wire management. Watch as part of the series or view the full installation video for complete guidance.

M2100E Installation – Housing

M2100E Installation – Step 4: Side Guides

This video covers the Side Guide Step of the M2100E installation. Learn how to accurately measure and set the correct height for side guides, accounting for floor variations and housing recess. Watch individually or as part of the full installation series.

M2100E Installation – Side Guides

M2100E Installation – Step 5: Curtain

This video covers the Curtain Step of the M2100E installation. Learn how to deploy the curtain, manage wiring, and connect the harness using bullet connectors. Watch as part of the full series or view the complete installation video for a detailed guide.

M2100E Installation – Curtain

M2100E Installation – Step 6: I/O Harness
This video covers the I/O Harness Step of the M2100E installation. Learn how to route wiring, install the diode, and prepare the system for initial calibration and testing. Watch as part of the full series or view the complete installation video for more details.

M2100E Installation – I/O Harness

M2100E Installation – Step 7: Motor Cable

This video covers the Motor Cable Step of the M2100E installation. Learn how to correctly connect encoder and limit wires, perform a pull test, and prepare the ribbon cable for closure. Watch as part of the full series or view the complete installation video for more details.

M2100E Installation – Motor Cable

M2100E Installation – Step 8: Front/Bottom Covers

This video covers the Front and Bottom Cover Step of the M2100E installation. Learn how to align and secure the housing covers before moving on to controller setup and calibration. Watch as part of the full series or view the complete installation video for details.

M2100E Installation – Front/Bottom Covers

M2100E Installation – Step 9: Calibration
This video covers the Calibration Step of the M2100E installation. Watch the system complete its calibration, perform cycle tests, and verify the down limit switch function before connecting to the fire alarm system. View as part of the full series or watch the complete installation video for more details.

M2100E Installation – Calibration

M2100E Installation – Step 10: Conclusion

This video wraps up the M2100E installation with a final overview of the cycle test and proof of function. It highlights the importance of verifying system operation before connecting to the building fire alarm. Watch as part of the full series or view the complete installation video for details.

M2100E Installation – Conclusion